EFFET-MER PROJECT

PERCÉ’S TRANSITIONAL BOARDWALKMaquette

The City of Percé invites you to live the EFFET-MER experience to better understand the effects of climate change on its coastline. The Percé coast is one of the most exposed to storms in the entire Gulf of St. Lawrence. Over the past years, several seaside infrastructures have suffered irreparable damage.

EFFET-MER is a temporary structure consisting of a walking circuit along the damaged section of the boardwalk and next to which two observation towers were erected. These
towers contain impactful visuals that reflect the effects of climate change on the coastline of Percé.

This ephemeral layout represents a transition towards a major rehabilitation and enhancement project (2018 - 2019) regarding the coastline of Percé, which aims to adapt our coast to new climate realities in order to preserve it for future generations.

 

DID YOU KNOW...

EFFET-MER is designed to be demounted, splitted and relocated; it is therefore 100% recoverable and reusable on another site.

The selected concept results from group discussions and exchanges of ideas involving some twenty citizens from all backgrounds.

 

Green symbolizes the environmental trend and the brightness of the color reminds us of the northern lights in Gaspésie as well as the luminescent plankton of our seabed.

 

At night, the towers are illuminated with a soft, diffused light originating from within, somewhat in the way of a lantern.

From the top of the towers, at a height of 12 meters, the extent of the visible damage demonstrates the urgency of action.

Effet-Mer is a project of 400 000 $ financed by the gouvernment of Québec.

UPDATE ON THE PROJECT OF THE TEMPORARY BOARDWALK: SEPTEMBER 15th, 2016

The 2 towers and the panels and pictures on climate changes are now completed and accessible.  The activity is very popular and also very appreciated by visitors and people of Percé.  Hundreds of persons are walking on the temporary boardwalk every day and climbing to the top of the towers.  The comments on the Effet Mer experience are very positive and appreciative.

effetmer1 effetmer2  effetmer4 effetmer5 effetmer3 efffetmer6 effetmer7

UPDATE ON THE PROJECT OF THE TEMPORARY BOARDWALK: AUGUST 30th, 2016

The East tower is now open to the public, hundreds of visitors have already climbed the 5 staircases to reach the highest level of the tower.  The view is spectacular. Visitors also show a lot of interest for the panels and spectacular images presenting the effects of climate changes in Percé. The West tower should be ready by the end of this week, and the circuit should also be completed.

Tour1 Tour2 Tour3

UPDATE ON THE PROJECT OF THE TEMPORARY BOARDWALK: AUGUST 25th, 2016

The transitory boardwalk project will be ready soon.  The second tower is almost done. In a short while you will be able to fully enjoy the complete Effet-Mer experience, by climbing to the top of the towers to admire the landscape but also to be able to have a better sense of the damages caused by climate changes in Percé.  The panels and photos on climate changes will help you understand the process and have a broader view of the phenomena.

Tour Ouest Tour Est Panneaux

UPDATE ON THE PROJECT OF THE TEMPORARY BOARDWALK: AUGUST 19th, 2016

The towers are almost ready, we will start implementing the visuals and pannels soon.  You can already see one visual on the Eastern tower.  A 37 ft (12 m) photo representing the real height of certain waves during a Storm (photo below).  To give you an idea of what to expect when the circuit on climate change will be completed, take a look at some of the visuals below.  To be continued…

TOUR EST-panneau-photos-epreuve

TOUR EST-panneau-2 copie

TOUR CENTRE-panneau-3-epreuve

 

IMG_2707

UPDATE ON THE PROJECT OF THE TEMPORARY BOARDWALK: AUGUST 10th, 2016

The Effet Mer experience is taking form. The 2 towers are in place, workers are finishing the exterior walls and the staircases.  As soon as the exterior walls are completed, we will start the implementation of pannels and photos of the circuit on climate change.  Coming soon!

EffetMer tour TourMur

UPDATE ON THE PROJECT OF THE TEMPORARY BOARDWALK: AUGUST 3rd, 2016

The transitory boardwalk is now accessible for people in a wheelchair.  The railings are almost completed along the boardwalk.   It is really nice to see thousands of people walking on the transitory boardwalk every day!

Promenade Foule Rampes Rampe1

UPDATE ON THE PROJECT OF THE TEMPORARY BOARDWALK: JULY 18th, 2016

The transitory boardwalk

The painting of the transitory boardwalk is completed.  There is still some work to be done like railings, directional signs, ramps for wheelchair access…it should be completed soon.

Trottoir2 Trottoir1

The towers

The production of the towers is progressing, the steel structures are being assembled at the workshop of Soudures Gilles Roy in Amqui.

Tour1 Tour2

UPDATE ON THE PROJECT OF THE TEMPORARY BOARDWALK: JULY 11th, 2016

We have started to paint the temporary boardwalk (picture below), it should be finished in the next few days.  If all goes as planned, the 2 towers should be in place by the third week of August.  The work for the concept of the visuals on climate changes is almost completed.  It is very impressive!

Trottoir_1 Trottoir_2